This project was on a new build and required us to install 3000 metres of underfloor heating as shown in the images above.

It also involved the installation of a plant room including a 60kw boiler and a low loss header.

We also installed a 400 litre hot water system which would run the house and the swimming pool, helping to make it more efficient and so reduce costs.

On the first and second floor 22 radiators of different styles and sizes were fitted.