Le guard retort installation to increase production.
The appliance being installed within this project was a Le Guard Steam pressure cooker installation, located within the factory. This project involved us to extend all the 4” xpress crimp stainless steel pipework from the cooling tower to the heat exchanges for the le guard retort. A 8 bar airline was installed for the hydraulic valves that control the retort. 2.5” Steam pies were installed for the cooking process and portable water for the cooling process. To release the excess steam expansion relief valves were fitted.